Heavy Grade Raised Access Floor Installation
- Energy Park, Kent
Wave Raised Flooring supplied and installed a Bathgate Heavy Grade raised access floor system with a factory bonded vinyl finish with steel pedestals to suit a 1,000mm void. We also constructed frames to help support the electrical panels being installed within one of the control rooms.
Raised Floor Visual Survey
- Office in Cambridge
Wave Raised Flooring were asked to carry out a visual survey of an existing raised floor for an existing client. This survey was carried out when the offices were closed, so areas of the floor could be lifted and inspection carried out of the floor voids.
Independent Raised Floor Survey
- HMSO, Scotland
Wave Raised Flooring were instructed to carry out detailed survey on existing raised floors that had been installed with a new office block in Scotland. The survey report was required to provide the client with an independent appraisal of the condition of the raised floor and interfaces prior to floor coverings being laid.
Raised Floor Condition Survey
- Sky — Multiple UK Sites
Wave Raised Flooring were called upon to carry out detailed survey reports to over 40 Technical rooms across the UK, where various types of raised floor systems had been installed. The purpose of the reports were so the client could understand the overall condition of the floor structure within each of the rooms and with our help plan a maintenance programme.
Gifa FHB Retail Floor Installation
- Shard Place
Wave Raised Flooring were selected to supply and install the Gifa FHB system to one of the retail units. We installed the FHB38 system along with thermal insulation within the floor void.
Floor Removal, Reinstatement & Restaurant Installation
- 40 Leadenhall Street
Wave Raised Flooring were awarded works within this building, where we had to carry out the removal of existing floor panels and pedestals ready for new partitions to be installed. After these had been finished we were then able to cut the panels and support them in line with the partitions. We also supplied and installed a Calcium sulphate Floor & more system within a luxury restaurant and bar area on one of the upper floors. The project involved the consultation and installation of a high performance raised flooring system where a natural stone finishes could be laid over the calcium sulphate floor panels.
Knauf Giffa & Calcium Sulphate Installation
- Aldermanbury Square
Wave Raised Flooring successfully supplied & installed the Knauf Gifa systems, within the washrooms on this prestigious project within the City. We also supplied & installed the calcium sulphate interlocking system within the lift lobbies on each floor and circulation areas with the ground and basement levels. Along with some small office areas where we supplied & installed steel encased panels raised access floor panels. The Gffa systems & calcium sulphate floors were finished with a range of natural stones and porcelains.
Calcium Sulphate Raised Floor Installation
- 8 Bishopsgate
Wave Raised Flooring were awarded this project to supply & install the Calcium Sulphate Floor & more systems within the washrooms on each floor. We also were awarded the package from another fit-out contractor to supply and install Calcium sulphate systems to the restaurant and director areas within this high rise office development. The floor finishes laid over the panels comprise a selection of natural stone, porcelain and timber planks.
Calcium Sulphate Raised Floor Installation
- IQL S4, Stratford
Wave Raised Flooring successfully supplied & installed a calcium sulphate Floor & more raised floor systems, within the washrooms and lift lobbies on each floor. We also supplied & installed some standard steel encased floor systems within service corridors and some small office areas. IQLS4 is a commercial office building in Stratford, that we were proud to work on. The project involved the consultation regarding the floor design and installation processes where a high performance raised flooring system was required to support a range of porcelain and natural stone finishes laid over the calcium sulphate floor panels.
Calcium Sulphate & Steel Panel Installation
- Ruskin Square
Wave Raised Flooring were awarded this project to supply & install the Calcium Sulphate Floor & more systems within the washrooms on each floor. We also supplied & installed some areas of the project with standard UK manufactured steel encased raised access floor panels and the Lindner Hydro system. The floor finishes laid over the panels comprise a selection of natural stone, porcelain and natural timber planks.
Calcium Sulphate Raised Floor Installation
- 21 Moorfields
Wave Raised Flooring successfully supplied & installed a calcium sulphate Floor & more raised floor system, within the washrooms on each floor. 21 Moorfields is another landmark commercial office building in the heart of the City, that we were proud to work on. The project involved consultation and installation of a high performance raised flooring system where a range of porcelain and natural stone finishes were laid over the calcium sulphate floor panels.
Calcium Sulphate Raised Floor Installation
- 90 Long Acre
Wave Raised Flooring were awarded this project to supply & install the Calcium Sulphate Floor & more systems within the main entrance areas which comprised of a series of ramps and steps along with tiered seating areas constructed from calcium sulphate panels supported with a steel sub construction. The floor finishes laid over the panels comprise a selection of natural stone and porcelain tiles.